Opportunities

Major projects & tenders

Large-scale procurement opportunities and project-development leads across the Africa–Europe energy corridor. Get verified to submit a bid or express interest.

EPC + modulesOpen

120 MWp utility-scale solar plant — Ouargla

Greenfield utility PV plant with single-axis trackers and grid connection to the national network. Seeking Tier-1 module supply and an experienced EPC.

Algeria
€48–56M
Submissions close in 6 weeks · Modules, central inverters, trackers, EPC
Hardware + O&MShortlisting

Fleet DC charging network — 40 sites

Nationwide fleet charging rollout for a logistics operator. Requires networked DC fast chargers, a charge-point management system, and maintenance.

Morocco
€9–12M
Submissions close in 8 weeks · 150–360 kW DC chargers, CPMS, 5-year O&M
Supply + installClosing soon

18 MWp C&I rooftop portfolio + storage

Behind-the-meter rooftop solar with battery storage across 22 industrial sites, targeting self-consumption and peak shaving.

Tunisia
€14–17M
Submissions close in 5 weeks · Modules, hybrid inverters, LFP storage
TurnkeyOpen

Hybrid microgrid programme — 12 communities

Rural electrification via solar-plus-storage hybrid microgrids with backup generation and remote monitoring across twelve off-grid communities.

Nigeria
€6–8M
Submissions close in 10 weeks · Solar, storage, gensets, controls
Equipment + integrationOpen

Green hydrogen electrolyzer pilot — 5 MW

Pilot electrolysis facility co-located with an existing solar plant, producing green hydrogen for industrial offtake and mobility.

Spain
€11–15M
Submissions close in 9 weeks · Electrolyzer, BoP, compression, storage
SupplyShortlisting

Agricultural solar pumping — 300 sites

Large-scale solar irrigation programme supplying pump systems and controllers to smallholder cooperatives across three regions.

Senegal
€3–4M
Submissions close in 7 weeks · Solar pumps, controllers, mounting

Projects shown are illustrative examples of the opportunities the platform surfaces and will be replaced by live tenders before production.